Nevada Condition Route 564
Condition Route 564 (SR 564) is definitely an east-west highway in Clark County, Nevada, within the southeast area of the Vegas Valley. The path travels with the town of Henderson, traveling in the junction of Interstate 215 (I-215) and that i-11 south and that i-515 north, also a part of U.S. Route 93 (US 93) and US 95, to Lake Vegas, ending near Lake Mead. The path was designated in 2002, replacing some of SR 146.
Condition Route 564 begins like a continuation from the Vegas Beltway, beginning where I-215 ends at its junction with I-11 and that i-515, that are concurrent around 93 and US 95. After that, the path travels east along Lake Mead Parkway, a significant arterial roadway, towards downtown Henderson and intersects the Boulder Highway (SR 582). SR 564 continues northeast through Henderson’s residential neighborhoods and turns east just west of Lake Mead National Entertainment Area. SR 564 enters the park, in a point southeast of Lake Vegas, and terminates in the finish of condition maintenance, as the road continues east. Around 52,500 vehicles travel on the road near its western terminus typically every day.
In 4 decades ago, the highways within the condition highway system were renumbered. SR 41 was split up into two condition routes. SR 146 is really a began from I-15 to all of us 93/US 95 in Henderson. SR 147 began from US 93/US 95 to North Vegas. A restricted access highway alignment from US 93/US 85 began construction in 1985-86. An interchange was designed for SR 146 in 1989-90, and also the highway was performed by 1995-96. The designation I-515 was put into the highway. Within the same period, SR 147’s designation was taken off eastern portion of Lake Mead Drive, and substituted with SR 146. Because the Vegas Beltway (I-215) had been built within the late 1990s, the final five miles (8.0 km) between Saint Rose Parkway and Interstate 515 were built around the SR 146 alignment. This left SR 146 in 2 separate segments. The eastern segment of SR 146 was reassigned to SR 564 by 2002. I-215 from SR 146 to SR 564’s western terminus was finished in October 2005.
The whole route is within Henderson, Clark County.
Route map: